Please note this is an abreviated version for a quick reply. We encourage you to use our full form in order for us to receive a  Rough CEMS vs. Sample Point Location Detail: Please Sketch the location with approximate dimensions for the sample point, CEM location, duct diameters/stack, distances to/from last obstruction in flow i.e. bend radius. 

Company Name
Address
Your Name
Phone
E-mail
Fax

Gas/Component

Gas/Components to Be measured:Please list the components to be measured, their minimum and maximum expected swings, the normal expected values and the measurement criteria.

Component
In (% Vol./ PPM
Maximum Expected
Desired Full Scale
Normally Expected

Unusual or corrosive contents of Flue

Please list all known or expected components including those that may cause operational or measurement problems for the CEMS. Include all acid mist gases with expected concentrations at the sample point.

 

Component SO3 NH3 Others?
In (%Vol/PPM)
Concentrations

Plant Details

Fuel Type:  Please list any fuels that are used either as operational fuels, augmented fuels or start-up/Shutdown conditional fuels with the percent of fuel used and the times
Fuel (coal, MSW, HazMat, Natural Gas
etc. Specify
Process:Power plant, Cement Kiln,
Incinerator, Gas Turbine

Flue Conditions

Operating Temp (deg F) Min - Normal -
Max
Operating Pressure Psi Min Normal Max
Water Dew Point deg F Min Normal Max
Acid Dew Point deg F Min Normal Max

Ambient Conditions

Sample Point deg F Min Normal Max
Sample Gas Line deg F Min Normal Max
Analyzer/System deg F Min Normal Max
Rel. Humid Max/year %
Requested Analog Output
Requested Digital Interface

Legislative Regulations

EPA
State
Local

Gas Sampling Questions

Number of Units Required
Are there any combustible or corrosives
located at or near the sample system
components
Yes
No

Please answer the following questions regarding the sample location

Is there safe access available at the
sample point and analyzer shelter phoint
Yes
No
Sample Probe enter length if heating
of the probe is required
Length of line from CEM shelter to sample
point DO NOT RELY ON ENGINEERING PRINTS
DATA ACQUISITION SYSTEM Required yes
no This field requires additional information
for accurate quote